[elevator energy saving] Hunan 98% elevator without adding energy saving equipment Wang Xiaoqin to the Provincial Quality Supervision Bureau supervision of the key proposals
Release time:2017-11-17
"Xiang Sheng news" should take the spirit of 'strict' and 'real', and do a good job in the implementation of the proposal. " In May 27th, Hunan province CPPCC Vice Chairman Wang Xiaoqin led the Provincial Bureau of quality and technical supervision on the key proposal "on the elevator emergency leveling reform proposal" consultations for that to fully understand the elevator energy-saving emission reduction and emergency leveling renovation work importance, to adapt to the new normal economic development and Hunan two type society construction requirements.
Statistics show that in the second half of 2014, the Changsha elevator emergency rescue center received 206 elevator calls, and 392 people were trapped. At present, the elevator has huge power consumption, which is one of the largest energy consumption equipment of high-rise buildings. The average daily power consumption of each elevator is about 83.8 kwh, which accounts for about 5% of the total building energy consumption. In our province, there are about 78 thousand elevators, which consume nearly 2 billion degrees per year, 98% of which do not install any energy saving equipment, while the coverage rate of elevator equipped with emergency leveling equipment is less than 5%.
"Energy shortage has become an increasingly prominent problem, and energy conservation has become an imperative choice for the current economic life." Chen Lixin, deputy director of the provincial quality and Technology Supervision Bureau, said that in February this year, after receiving the proposal, the Provincial Quality Supervision Bureau carried out an investigation on the elevator energy saving and emergency level work in the surrounding provinces, and purchased 6 energy-saving elevators for testing.
However, the state is not currently on the elevator energy-saving product certification and accreditation, such lack of data standards, difficulty elevator energy-saving product pilot has yet to open is still the proposals for the provincial housing department, the authority of the Department of finance, the relevant person in charge from the market, policy and regulations, investment and other aspects of the current need to solve the problem.
"The related problems can be promoted and should be promoted as soon as possible." Wang Xiaoqin pointed out that to deal with the proposal, we should actively guide and cooperate with each other to form a joint force and do a good job in the relevant basic work. In the process of upgrading and innovating the elevator energy saving equipment, the concept of safety first must be established to ensure a good safety clearance.